Bridges are subject to hostile climatic conditions as well as
impacts of successive heavy transport loads. The prefabricated
concrete transport infrastructures offers the best resistance
to face harsh climatic changes and a demanding road usage.
Quick and efficient construction and site erection
(
Preview

)
With the " Just in time " delivery system, prefabricated
concrete structures arrive on the construction site ready to
be installed therefore minimizing the risk of a cramped work
areas. Climatic conditions do not prevent the works progress.
The speed of construction, the expertise of our installation
crews and the respect for schedules, permit a limited traffic
interruption.
Minimized production costs
(
Preview

)
The high performance concrete prefabricated at SCHOKBETON's
factory does not require painting and resists corrosion. Long-term
maintenance is minimal and a project's returns on investments
remain constant.
Urban efficiency
(
Preview

)
AASHTO beams can achieve up to 45 metres, allowing fluid car
traffic on the expressway or boat traffic on a sea route passing
under the infrastructures.
The flexibility of prefabricated concrete
(
Preview

)
Prefabricated concrete allows the creation of magnificent bridges
which would have been impossible with other materials because
of their prohibitive costs. Prefabrication at SCHOKBETON's factory
offers attractive architectural solutions.